That Pesky Chore List

Under Control

That chore list I described when we first arrived here in Lüderitz is actually getting a bit shorter. I know you think we've only been gallivanting over the Namibian countryside and cavorting over deserts chasing wild horses, but in actuality, we're also getting a few things accomplished … and they were actually on the to-do list.

We've had a couple of extremely windy (30-35+ knot) days when there was a chop on the bay and we could see whitecaps all around us. Those were good days for concentrating on inside chores. With so much power, I was able to sew without worrying about power consumption. I fabricated a new dinghy engine cover which I'd been putting off (rather successfully, I might add) for over a month.

new dinghy engine cover

I re-stitched the boom crutch cover, but as usual, it wasn't as easy as anticipated. The twist-locks  which hold the cover in place were pulling out, so they had to be removed. I stitched on reinforcement patches (12 of them)  and then David re-installed the twist-locks. Typical small project that should have taken 30 minutes ended up taking a whole morning. Sewing a new zipper in my foul weather bibs was easy compared to the other two projects. And the chafe guard between the dinghy storage location on the foredeck and the hatch cover was just straight stitching … a piece of cake … for me. David had some problems securing it, but managed after giving it some thought (and choice invectives).

repaired boom crutch cover

David has been working on a rather clever electronics project: a gizmo that measures and displays the amps and amp hours produced by our alternative energy sources, i.e. wind, solar and prop generator. I'll let him tell you about it himself, but the finished product all mounted and labeled and backlit is pretty impressive. Of course, I'm from the “dark side” (marketing), so what do I know?

alternative energy monitor

David's tackled the calcification in the head hoses … nasty job, but done. The fairleads for the traveler are now in place. He's tinkered with the reef lines and is happy with them now and the shaft brake has been adjusted.

Still, a few more things to do … additions actually. It's time for preventive maintenance on the dinghy engine and before we leave for the Atlantic transit, I need to do the annual ditch bag check. We've eaten up some stores, of course, so we'll need to do a mini-provisioning before we leave Namibia.

With all those chores accomplished, I think it's time for more play. Just need to convince the captain!

Chore List Growing

No matter what port we're in or what we've accomplished in the last port, there always seems to be more chores on the list than the time we've allotted to them. Could be there are lots of chores … could be we're lazy. Whatever ... the chore list is growing and we're attacking it slowly. We want to make sure we don't run out of chores and get bored. luderitz chore list

We didn't break much on the trip here. Thank, Neptune! Heck, it was only 77 hours, not an ocean passage, so we were hoping we'd arrive in basically one piece and, thankfully, we did. We did break a sail slide which David has already repaired … downwind sailing with big gusts and waves is tough on the main. He's also been fiddling with the new Dyneema reefing lines which aren't quite right. He wants to add new fair leads to the bottom of the boom to raise the main sheet off the top of the bimini … we've noticed some chafe there.

The dreaded list of sewing repairs has gotten out of hand. The zipper broke on my foul weather bibs and needs replacing. Getting too chubby, you insinuate? Perish the thought … they're 15 years old and the plastic ziphead just snapped right off. David's broke, too, but his just require replacing the little lanyard on the pull-tab.

new zipper on bibs

I noticed that the stitching on the boom crutch cover has disintegrated with UV exposure over time, as have the covers for the handholds on the coach roof. All need restitching.

boom crutch cover

The outboard engine cover which is only a couple of years old is falling apart. David has lashed it with line till I get around to making a new one. I think it wasn't made as robustly as I thought it was and we have some thoughts on the replacement design.

outboard engine cover

David has also noticed some chafe on the forward hatch where the dinghy rests during passages. We need to make a chafe guard of some sort to take care of this.

The head hoses are starting to calcify and need some attention and the shaft brake was squeaking a bit during the last passage … enough to warrant an adjustment.

So … as you can see, the chores never end. BUT, we're in a charming little seacoast town in  Namibia … on a free mooring ... where people are very friendly,  skies tend to be blue and the days are mostly warm and sunny. Really … we have no complaints … but I guess we need to get busy.

The Blue View - Replacing the Cockpit Rope Clutches

A rope clutch, when engaged, allows a line to be pulled in one direction, but not the other. When the handle on the top of the clutch is lifted, disengaging it, the line tension is released allowing it to be pulled in either direction. It is a handy invention, especially on a sailboat where there are dozens of lines that need to be controlled, adjusted and secured. One of the most common uses of rope clutches is to allow several lines to share one winch. Each line can be adjusted up or down using the winch, then locked in place with its clutch. replacing the rope clutch

Nine of Cups will be 29 in December 2015, and with each passing year, more of her original equipment reaches its “Use By” date. A case in point is the triple rope clutch in the cockpit that is used to control the main halyard, topping lift and spare halyard. It not only looked its age, it would no longer hold the lines in place once they were unwrapped from the starboard winch. Replacing it was on our to-do list for Durban, and a new Garhauer triple clutch was one of the parts Marcie brought back in her luggage from the States.

the old and the new clutch

Unfortunately, the new clutch had a different footprint than the old one, so the job involved more than merely unbolting the old and screwing down the new. A new teak pad to support the clutch would have to be made and finished, and and all but one of the bolts that secure the clutch to the coachroof would need to be repositioned.

As I learned when rebuilding the engine instrument box, teak is difficult to find and very expensive here in South Africa. I did have a small piece aboard left over from another project that would work for the pad, however. I cut it to size, drilled the necessary holes and sanded it down. I finished it using eight coats of a polyurethane finish I like. It is a New Zealand product called Uroxsys (now marketed in many parts of the world as Awlgrip Awlwood MA).

Our coachroof is constructed of a top and bottom layer of fiberglass laminated to a core of balsa. Screwing the clutch directly into the balsa core would be, at best, a short term solution. Even if the balsa had the initial structural strength to secure the clutch under the load of three heavily tensioned lines, which is doubtful, the lateral forces on the screws combined with any moisture that made its way into the screw holes would continually reduce the holding power of the screws. A much better solution would be to bed the bolts in epoxy.

epoxy graphic

I marked the bolt locations on the coachroof, then drilled oversized holes. The bolts were 1/4” (6mm), so I drilled 1/2” (12mm) holes, double the diameter of the bolts. I also drilled out the old holes that were no longer going to be used with a 5/16” (8mm) bit, only slightly oversized, and then cleaned out all the holes with a vacuum cleaner. I masked both the bottom of the teak pad (I didn't want to accidentally bond the pad to the deck) and the area around the holes. Next, I did a dry fit to make sure everything would go together smoothly later when my hands were all gooey with epoxy, then removed all the parts. The final step of the prep work was to lightly grease each bolt with silicone lubricant to prevent the bolts from bonding with the epoxy.

I keep West System epoxy on hand, and I mixed a small batch (2 full pumps or about 1.6 fl oz) of 105 resin with the equivalent amount of 206 slow hardener. I used a Q-tip to wet out each hole, then mixed 403 filler with the remaining epoxy until it was about the consistency of catsup. Using a small craft stick, I put about 1/2” (12mm) of the thickened epoxy in each new hole, and used all but a small blob of the remaining epoxy to partially fill the old holes.

The next step was to assemble all the parts before the epoxy kicked. I positioned the teak pad and clutch in place, then pressed each screw fully into its hole.

one old bolt and five new

Now the goal was to let the epoxy harden enough to hold the bolts in place, but not to harden beyond the point that it would still bond with additional layers of epoxy. The perfect point is when it is still slightly tacky and can be dented with a fingernail. Since the epoxy in the holes can't be monitored, I kept the mixing pot with the remaining blob of epoxy to check the cure rate. It was fairly hot that day, and it took about 1.5 hours to reach the right hardness. I carefully unscrewed the bolts, then removed the clutch and teak pad and screwed each of the bolts back into their holes. I mixed up another batch of epoxy, again adding 403 filler until it was the right consistency, then filled all the holes. I used a toothpick to probe each hole and release any trapped air bubbles. Then I let the epoxy completely cure for a few days.

I used Sika 291 as a bedding compound, sealant and adhesive between the teak pad and the deck. This raised the teak pad enough that the bolts didn't bottom out in the epoxy when they were tightened down. Alternatively, I could have added a washer under the head of each bolt.

All in all, a lot of work, but I am optimistic it will last another 25-30 years. If so, I'll be in my 90s when it wears out. I just might splurge and hire someone else to do it next time.